I was a bit late taking photos of this one
A multinational chemical company needed a replacement tank, so details had to be closed so as to lift out and lift in the new one – the pipework connections on the new tank matched the old chemical.
All built from scratch with pride and care in our Minto workshop
Contact us for a bespoke system to suit your specific needs.